Material Management Flow Chart

  CWP IFC: This occurs when the last of the isos for this CWP are issued to the field as IFC – Notification will come from Engineering. ConstructSim: Apply IFC’d Isos to the model – Executed by the WFP Database Administrator. Virtual FIWPs: When CWP reaches 100% IFC Workface Planner and the Field Supervisors [...]

By |2018-10-09T17:31:24+00:00November 29th, 2016|Uncategorized|0 Comments

3D Mode Administrator

Job Description Job Title: WorkFace Planner Organisation: Construction Contractor Reports to: Superintendent – Functional WorkFace Planning Lead – Matrix Summary The Workface Planner is responsible to build Field Installation Work Packages for the construction contractor’s workforce. A typical WorkFace Planner will build and maintain FIWPs in one discipline for one General Foreman or approximately [...]

By |2017-10-10T22:07:00+00:00November 25th, 2016|Uncategorized|0 Comments

Turnover Systems

Prior to the start of Construction the Ready For Operations Team (RFO) are responsible to identify exactly how they would like to receive the completed plant. They do this by identifying the turnover systems on Piping and Instrumentation diagrams (P&IDs) and building a sequence of turnover between the systems. The engineering teams are then [...]

By |2017-10-10T22:07:08+00:00November 25th, 2016|Uncategorized|0 Comments

Construction Work Packages

The Construction Work Packages (CWPs) are a deliverable from Engineering to Document Control that are identified on the level 3 project schedule. A CWP can be considered complete when more than 95% of the drawings have been issued for construction and submitted to Document Control. The engineering portion of the CWP (part A) is [...]

By |2018-01-15T22:52:43+00:00November 25th, 2016|Uncategorized|0 Comments

Work Breakdown Structure

The Work Breakdown Structure (WBS): A progressive dissection of project deliverables with parent – child relationships. The WBS is typically established prior to detailed engineering and is the base platform for the 3D model, Document Control, Material Management, the Project Schedule, Project Controls and Cost coding. This allows the WorkFace Planners to align work [...]

By |2018-10-09T16:47:30+00:00November 25th, 2016|Uncategorized|Comments Off on Work Breakdown Structure

Field Installation Work Package

The Field Installation Work Package is identified in the Work Breakdown Structure as a sub component of each Construction Work Package (CWP) and equivalent to a level 5 schedule activity. The ideal CWP is less than 40,00 hours, a level 3 schedule activity and a single discipline (trade). A single CWP is then dissected [...]

By |2018-01-15T22:51:57+00:00November 25th, 2016|Uncategorized|Comments Off on Field Installation Work Package