Case Study: Impact of AWP Methodology on Project Execution

The criticality of the project resides in its novelty and its potential disruptive impact on extraction activities.
Case Study: Mid-Project WFP Review

The optimal path of construction was mapped but was not shared/followed by engineering.
Case Study: Optimizing WFP Execution

The Owner project scheduler has a working model for schedule development
Case Study: Productivity Audit

The system utilized for Time on Tools analysis is a proven methodology that is recognized as a key measurement tool within industrial engineering.
Case Study: WFP Audit Processes and Findings

The structure of the IWPs is mostly compliant with the Owner procedure.
AWP Conference 2024

The 16th Annual AWP Conference 2024 is a conference for construction professionals focused on improving project outcomes.
Project Controls Summit 2024

An AWP Virtual Event for the Britain and EU Construction Industry. Join Insight-AWP, a major sponsor, on April 20th, 21st and 22nd for this AWP Europe Virtual Conference.
Please note the time zone which is British Standard Time.
Case Study: 40 Day Shutdown and Pre-shutdown Scope

The project was well planned with a detailed schedule developed by the project management team. However the late interaction of the contractors did not allow them to vet the activity dependencies.
Creating an AWP Data Strategy

Creating an AWP Data Strategy Insight AWP joins O3 Solutions to discuss how clients can use AWP data strategies effectively during the implementation of Advanced Work Packaging projects. Learn how O3 and Insight AWP have partnered to support clients with robust a AWP data strategy – with help from Subject Matter Experts and AWP software […]
AWP Conference in Houston

An AWP Virtual Event for the Britain and EU Construction Industry. Join Insight-AWP, a major sponsor, on April 20th, 21st and 22nd for this AWP Europe Virtual Conference.
Please note the time zone which is British Standard Time.