Geoff Ryan

/Geoff Ryan

About Geoff Ryan

This author has not yet filled in any details.
So far Geoff Ryan has created 1 blog entries.

Construction Work Packages

The Construction Work Packages (CWPs) are a deliverable from Engineering to Document Control that are identified on the level 3 project schedule. A CWP can be considered complete when more than 95% of the drawings have been issued for construction and submitted to Document Control. The engineering portion of the CWP (part A) is [...]

By |2018-01-15T22:52:43+00:00November 25th, 2016|Uncategorized|0 Comments